Last week of August was spent cleaning the rear axel of old grease then
taking it outside to be sand blasted. Since this picture I have just sand
blasted and painted the rear axle. The frame, front axle, springs and many
small parts have been painted. In a week or two the truck should slowly
start to come back together again.
9/01/99 |
 |
Here I have laid out all the engine
components in order that I removed them, right to left with the number one
piston on the left. Next I took the head and engine block into town to a
local engine rebuild shop to be hot tanked and checked for cracks. The
shop found four hairline cracks in the head and had to bore the cylinders out
.040 thousands. Before I can order a rebuild kit I need to check main
bearings valves, etc. for possible replacement. Since I am back north
working on the Alyeska pipeline north of the artic circle for the next two
weeks work on the engine will continue after the first of the year.
12/10/99
|